Consultation
Quote
Contract
Design
Permits
Site Preparation
Pre Site Inspection
Excavation
Structural Steel
Rough Electrical & Plumbing
Pre Gunite Inspection
Gunite
Tile / Stone / Coping
Decking
Equipment Set
Pool Clean-Out
Fence Replacement / Alarms
Pre Plaster Inspection
Plaster
Pool Fill Up
Site Clean-Up
Equipment Start-Up
Customer Orientation
Final Inspection
1st Month's Maintenance

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
22. Equipment Startup
Equipment is started and water chemistry is balanced once the pool is entirely full. 

Water features are tested to ensure proper function, lights are operated, GFI is tested and the system is placed on a schedule to circulate and sanitize the water in preparation for swimming.