1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
15. Equipment Set
Equipment is set on the pad and installed once the decking has cured to the point it can handle the traffic.
The equipment is installed and ran through to ensure perfect operation and prior to interior finish installation.