10. Rough Electrical & Plumbing
Main drain lines are dug and placed prior to structural steel.
Following the steel placement the remaining electrical and plumbing is installed in the pool and back to the equipment area.
All plumbing is placed under pressure to ensure integrity through out the project.
The pressure on the piping in not removed until after concrete in installed guaranteeing a flawless system.